A repair that can only be reached from underneath the foundation must be documented with video or photos by the plumber and given to the building inspector to confirm it meets code.
No. The city’s Chapter 98 plumbing fee schedule lists $17 per water heater, plus a $29 permit issuance fee. A water line is also $17, and a building sewer service is $30.
The city checked more than 23,000 service lines in 2024 and found none made of lead.
In the water meter box, which sits just below ground, normally next to the street. Closing that valve shuts off the water to the whole house.
Homes with an address ending in an even number water on Wednesday and Saturday, odd numbers on Thursday and Sunday. Nobody waters on Monday, between 10 a.m. and 6 p.m., or while it is raining.