Yes. Keller’s fee schedule lists a separate $100 generator permit, alongside $100 permits for solar and for electrical work when no building permit covers the job, and it only issues permits to registered contractors.
Often, but it depends on what the panel already carries. Each Level 2 charger needs its own dedicated circuit, so we check the capacity for both before quoting, and include any panel upgrade they would need.
It depends on what you want to keep running. We size the generator from the load, including the AC, heat, refrigerator and any medical equipment.
Yes. Keller’s electrical amendments require every circuit to be identified by its specific purpose, clearly enough to tell it apart from every other circuit and not based on who happens to use a room. Any circuit we add is labeled that way.
Yes. On February 16, 2021, the NOAA station at Alliance Airport near Keller fell to 2 degrees below zero, and electric heat runs hardest on nights like that. Book a panel check Monday to Friday 7 to 6 or Saturday 8 to 3. For sparks or a burning smell, cut the power if it is safe and call our 24/7 line.